The support programme "model refurbishments” sets a benchmark with 45 role model projects as a basis for new thermal refurbishments of buildings.
Refurbishment standards of today set the limits for emissions from buildings for the next 40 years. Within some decades the building sector should be totally free of emissions. So the support program of the Climate- and Energy Fund wants to enable this by establishing a refurbishment support program. This program is based on publishing role model examples of refurbishments, so that they can be easily copied by other people that want to invest in thermal refurbishment.
Contents of the support program:
The programme supports comprehensive refurbishment projects on operational level as well as on public buildings.
Possible combination:
- thermal refurbishment
- implementation of renewable energy (photovoltaic, solarthermal plants, CHP, etc.)
- energy efficiency measures
Subsidy height: max. 600.000€
- thermal-energetic building refurbishment:
Þ 45% of the relevant investment costs
Þ + additional fees of up to 60% in total
- measures on implementation of renewable energy and energy efficiency:
Þ 25 % of the relevant investment costs
Þ + additional fees of up to 35% in total
There is also an additional fee for Eco-Innovations:
by reaching "Passive House” standard (5%) or
the so called "klima:aktiv Gold Standard” (5%) or
reaching the "Plus Energy House” standard (10%)
and there is also an extra fee for the use of ecological insulation materials (5%).
Target groups for the subsidy programme:
all people with industrial activities
confessional institutions and associations
contractors
accommodations with more than 100 beds
public institutions and local authorities
With the support programme "model refurbishment” the Climate- and Energy Fund lies the main focus on high implementation of renewable energy, use of climate protecting materials and products within the refurbishment, measures on energy efficiency, no or very low level of cooling needs and a high level of innovation. For the whole support programme there is an amount of 10.9 million Euro available.
Louvenia (01.06.2017):
___________ ______ _______
___________ ______ _______ (http://makel25.ru)
___________ ______ _______
The surrounding area of the existing biogas plant, located in Strem should be used for a building of new energy, research and study center. When everything goes according to the plan, up to 200 green jobs and up to 150 study places should be created.
Developer
Reinhard Koch developed
this model of a visionary CENTER for FUTURE ENERGY TECHNOLOGIES. Together with
his brother Markus Koch, who is an approved expert in the field of thermal
gasification and heads the biomass power plant in Güssing, Reinhard Koch will
establish and run this center.
Research
Researchers, under
the guidance of Prof. Hofbauer will have perfect conditions in the research
facility to advance the existing technologies. The researchers will work
intensively in the pilot plants to close the gap between basic and applied
research.
Support
Integrated in the
center will be the worldwide-known "European Center for Renewable Energy
Guessing”. Focus of the EEE is the development of energy concepts based on the
experiences in the "ecoEnergy Region”. The EEE is also advisor of governments
and strongly involved in the energy strategy of the European Union.
Education
Another core theme
will be the advanced training, in theory as well as in practice. For the
theoretical part, an academical education will be available at the location
Strem. Through a cooperation with an Austrian university, it will be possible
for students all over the globe to make their master’s course in renewable
energy in Strem. Therefore it is necessary to build a university building with
lecture rooms and laboratories, as well as accommodations for the students.
Eco-Energy tourismus
In addition,
demonstration plants for the practice will be available. Future plant operators
have in this way the opportunity to train their personnel professionally.
Experiences from Güssing in the past years have shown, that every year thousands of tourists are going to visit such unique centers. A special trained group of people will guide these eco-tourists. Therefore it is necessary to build a hotel that also includes a restaurant.
To summarize, following structural measures are necessary:
- Office building (Administration, EEE, Engineering)
- Research facility & technical center
- University building
- Conference center
- Accommodations
- Hotel
- Restaurant
The U.S. Department of Energy (DOE) today announced that its international energy storage database (www.energystorageexchange.org) has surpassed 420 documented energy storage projects from around the world. The database, the first of its kind, provides free, up-to-date information on grid-connected energy storage projects and relevant state and federal policies. It is funded through DOE's Sandia National Laboratories, and has been operating since January 2012.
The Energy Storage Database lists 420 energy storage projects from 34 countries with a combined 123GW of installed capacity. More than 50 energy storage technologies are represented worldwide, including multiple battery technologies, compressed air energy storage, flywheels, gravel energy storage, hydrogen energy storage, pumped hydroelectric, superconducting magnetic energy storage, and thermal energy storage. The policy section of the database shows 18 federal and state policies addressing grid connected energy storage, from rules and regulations to tariffs and other financial incentives.
Anybody can create an account and add projects, and each project goes through a vetting process where database staff contact the project owner to verify data accuracy.
AlpStore FINAL CONFERENCE and Study Trip, February 26-27, 2015
A great success for the AlpStore final event in the Aosta Valley